Laying the foundation stone: a new photovoltaic power plant under construction
Laying of the foundation stone in Bordeaux. Laying of the foundation stone under a reception tent This ceremony of laying the foundation stone of the Labarde Photovoltaic Power Plant took place on September 23 in Bordeaux. For the organization of this event, the renewable energy producer JP Énergie Environnement chose to use the services of Atawa. Located near the former Bordeaux Métropole landfill, the Labarde photovoltaic power plant is the largest solar power plant in Europe in an urban environment. For the organization of this foundation stone ceremony, JPEE worked in close collaboration with Atawa. It was therefore chosen to install a 150 m2 reception tent to receive all the guests of the event including the mayor of Bordeaux.
Key products of the event
Laying the foundation stone in Bordeaux
THIS GROUNDBREAKING CEREMONY FOR THE LABARDE PHOTOVOLTAIC POWER PLANT TOOK PLACE ON 23 SEPTEMBER IN BORDEAUX. FOR THE ORGANISATION OF THIS EVENT, THE RENEWABLE ENERGY PRODUCER JP ÉNERGIE ENVIRONNEMENT CHOSE TO USE THE SERVICES OF ATAWA.
Laying the foundation stone in a reception tent
The Labarde photovoltaic power plant, located near the former Bordeaux Metropole landfill site, is the largest solar power plant in Europe in an urban environment. JPEE worked closely with Atawa to organise the groundbreaking ceremony.
It was therefore decided to install a 150 m2 reception tent to accommodate all the guests at the event, including the mayor of Bordeaux. To optimise the space, this structure with a floor was extended by a 50 m2 awning. For safety reasons, and because the event was taking place directly on the car park in front of the site, the Atawa teams ballasted the structure. As far as sanitary facilities are concerned, the managers chose to install two dry cabins with a washbasin, mirror and plants outside the structure.
Well thought-out equipment for the corporate event
A 4 m2 podium with carpeting, skirting and stairs was set up inside the reception tent for the organisers to make their speeches. There was also a display grid for the retrospective display of the project. In addition, a lectern was set up for speakers to put their computers and speech cards.
Guests were able to sit comfortably on elegant Napoleon chairs and then enjoy the cocktail party on modern-design table tops.
As for the power supply, Atawa chose to use a 20kva generator. This was powerful enough to power all the equipment used during the ceremony. In case of need, a back-up unit was also available on site. In terms of acoustics, the person in charge chose to use a sound system that was powerful enough to ensure that all the guests could hear the speakers' speeches. Two screens were used for the presentation of the site under construction.
A comprehensive event management service for this corporate event in Bordeaux
Just over 100 guests attended the installation of the first photovoltaic panel of the Labarde solar power plant. As a partner of the event, Atawa was responsible for the supply of all the equipment necessary for the smooth running of the ceremony. It should be noted that the dedicated support for this project was completed in only 3 weeks. The entire structure was assembled the day before the event. Dismantling was carried out in the wake of the ceremony.
Testimony
Ile-de-France • Centre-Val de Loire
01 40 50 19 42
Provence-Alpes-Côte d'Azur • Corse
04 84 49 62 64
Nouvelle-Aquitaine
05 35 54 59 88
Hauts-de-France • Normandy
03 74 09 83 62
Bretagne • Pays-de-la-Loire
02 57 64 07 94
Grand-Est • Bourgogne
03 52 74 06 68
Auvergne-Rhône-Alpes
04 28 29 61 35
Occitanie
05 82 95 39 28
subtitle
Product name